Insulation resistance measurements made during annual inspections
Associated issues
- It takes time to measure and record the insulation resistance of the many circuit breakers in service panels.
- It takes time to create reports back in the office.
Solved by GENNECT Cross!
- Site photographs and drawings on which measured values have been noted can be used as reports.
- Since reports can be completed while measurements are made, the amount of work that needs to be done in the office can be significantly reduced.
- Since measured values are sent wirelessly, there’s no need to make handwritten notes.
Intuitive reports can be created using photographs and measured values in the field.
Using the field maintenance function, reports can be completed while measurements are made.
The field maintenance function lets you place measured values on photographs.
In the case of annual inspections, you can take a photograph of a service panel and place the results of measuring the insulation resistance between each phase and the ground on the photograph.
1.
Take a photograph of the service panel.
2.
Tap the photograph to place measured values on it.
3.
The measured values will be placed on the photograph.
4.
Once you’re finished making measurements, generate a PDF report.
Once you’re finished making measurements, generate a PDF report.
You can create a PDF report like the one below in the field.
You can create a PDF report like the one below in the field.
GENNECT Cross functions used
Supported instruments
with Wireless Adapter Z3210
Connect the Wireless Adapter Z3210 to the instrument for Bluetooth® communication.
Built-in Bluetooth® communication function
Want help or have questions?